Afriquegp documents how our processing equipment is built, tested, and maintained so that Australian quarry operations can meet their own safety obligations. This page collects the evidence behind our reliability claims: engineering checks, operator guidance, and the practical steps we take before a machine reaches your site.
Operators and site managers ask us the same practical questions before commissioning new extraction or refining equipment. Here are direct answers based on field experience across Australian quarry operations.
Every unit ships with a full operator manual, a site-specific risk assessment template, and a lockout/tagout procedure sheet. We also include a commissioning checklist that your maintenance team can adapt to your own shift patterns and site layout.
Yes. Our commissioning engineers run a two-day hands-on session at your site, covering daily inspection routines, emergency stops, and common fault recognition. The training is practical and follows the actual control layout of the machine you purchased, not a generic demo unit.
We keep a documented parts list for every model we have sold in Australia since 2012. If a component is not in our local warehouse, we give you a confirmed lead time before you place the order, so there are no surprises during a scheduled shutdown.
For sites within 400 km of our service hubs, we aim to have a technician on site within 48 hours of your call. For remote operations, we start with a video diagnostic session the same day and dispatch parts immediately if a replacement is needed.
In most cases, yes. Our integration team measures your current belt width, drive configuration, and control voltage before recommending the right adapter kit. We have connected our crushers and screens to systems from several major brands without replacing the full line.
We suggest a visual inspection every shift, a lubrication check every 40 operating hours, and a full wear-part inspection every 250 hours. The exact intervals depend on the abrasiveness of your feed material, so we refine the schedule after the first month of production data.
Safety records are built on documented procedures, not promises. Here is what site managers and maintenance leads say about working with our equipment and support teams.